Removable Iron PIT Installation Image
Removable Iron PIT Installation Image
- ROLL Type System L6,500*W2,500*H1,000
- GRATING Type System L6,500*W2,500*H1,000
| Site Preparation |
1. Portable Automatic Tire Washer Installation Equipment : Forklift 7Ton or More, Excavator 0.8 ton or More 2. Supplementary Water Work : 1/2B(13mm) PIP or HOSE 3. Electric Entry Construction : Power 20kw 3Ø 380V or 220V, CABLE 660CV 22㎥ × 4C 4. Basic Construction(Digging a Trench, Floor Concrete Casting, Concrete Work on Entrance and Exit) 5. Vinyl Work on the Iron PIT Contact Surface Before Concrete Casting |
|---|
-
01 Digging a Trench -
02 Digging a Trench -
03 Floor Concrete Casting -
04 Installing the Portable Automatic Tire Washer -
05 Backfilling Work -
06 Formation of the Entry and Exit -
07 Rebar Placing on the Entry and Exit -
08 Concrete Casting on the Entry and Exit -
09 Complete Installation and Pilot Operation